Alamogordo Public Schools

Capital Projects & Construction

Thank you to our community for approving the $15 million GO Bond to lift our older schools to a higher level and voting to continue your support of the Mill Levies (SB9 & HB33). This site will be continually updated with important capital improvement & construction projects throughout the Alamogordo Public Schools District.

Construction Worker Measuring Wall

Building a better future for all our students

Because of the support of our community, we are getting to work on important projects that will improve our student environments!

With the approval of the 2023 general obligation bond & additional funding, including mill levy funds, Alamogordo Public Schools will be able to invest in our older campuses lifting them to a higher level that is more comparable to our new schools.


Areas of investment include Safety & Security, Outdoor Learning & Playgrounds, Internal Learning Environments, Athletics, Technology and Building Systems.

This is just the start!

The $15 million general obligation bond that was passed by voters in May 2023 provides capital improvement funding for the next 4 years. Current SB9 & HB33 Mill Levy funds are also available and being utilized thanks to voter approval in 2018 & 2019 and renewed again in November 2023. Additionally, grant and other funding is utilized whenever possible to ensure the most appropriate and efficient use of funds available. As we move forward with projects a variety of important information is taken into consideration for which projects are chosen and when they will take place.


Key considerations for project prioritization include:


  • Security: Ensuring the safety of students and staff remains paramount.
  • Minimal Disruptions: Striving to minimize disruptions to the learning environment.
  • Value Maximization: Leveraging additional funding sources such as state grants and local resources.
  • Cost-Effectiveness: Rigorously vetting options to ensure the best value for investments.
  • Efficiency: Exploring economies of scale and the availability of local contractors.
  • Planning and Design: Accounting for permitting, architectural designs, and other logistical factors.
  • Needs vs. Wants: Thoughtfully balancing essential needs with desirable enhancements.


If you would like to schedule a meeting to discuss this process please contact: communications@alamogordoschools.org


Current Projects

House bell intercom and camera

Safety & Security

Outdoor Learning

Rooftop HVAC

Building Systems

Number 20, painted on the paved ground of a parking lot with white paint.

Paving & Striping

Athletic field

Athletics

Chaparral Middle School Replacement

Click on the right and left sides of the slides below to find details of individual projects.

The district will strive to efficiently utilize any newly available or additional funding sources as they become accessible.

Safety & Security

Current projects

Funding

GO Bond







SB9

SB9

  • Facility access control - Security cameras, intercoms, and buzzers will be installed at every school that does not currently have this level of access control.
  • Stepping Stones Pre-Kindergarten
  • North, La Luz, Buena Vista, Sierra, High Rolls & Yucca Elementary Schools
  • Chaparral & Mountain View Middle Schools


  • Security camera improvements at Mountain View Middle
  • Security Fencing at Yucca Elementary

*All Alamogordo Public School campuses have full-time security officers onsite. Each elementary school and Holloman Middle School have 1 security officer, Chaparral & Mountain View Middle Schools have 3 officers, Alamogordo High School has 10 security officers, and there is 1 night officer.

House bell intercom and camera

Outdoor Learning & Playgrounds

Current projects

Funding

GO Bond


SB9

SB9

SB9

GO Bond

GO Bond

Multiple

  • Artificial turf and track installation at La Luz, Buena Vista, Sierra & Desert Star elementary.
  • Playground sunshade replacement at La Luz Elementary
  • Playground sunshade replacement at High Rolls Elementary
  • Installation of new sunshade at North Elementary
  • Shade Structures at Mountain View Middle School
  • Shade and outdoor learning area at Desert Star
  • Green space, fencing, shade structures, and courtyard improvements at North Elementary - In design
Rooftop HVAC

Building Systems

Current projects

Funding

SB212

SB212

SB9

SB9

SB9

SB9

SB9

SB9

SB9

SB9

SB9

SB9, SB212, Insurance

GO Bond

GO Bond

  • Roof replacement at La Luz Elementary
  • Building automation control upgrades at La Luz Elementary
  • Fire alarm replacement at La Luz Elementary
  • Gym floor recoating at Chaparral Middle
  • Window tinting at Sunset Hills Elementary
  • Intercom & PA system upgrades at Desert Star Elementary
  • Fire Suppression upgrades at Yucca Elementary
  • Exhaust system upgrade for kiln room at Alamogordo High
  • HVAC improvements at Mountain View Middle
  • HVAC improvements at La Luz Elementary
  • Security camera improvements at Mountian View Middle
  • Gym Roof repairs at Chaparral Middle
  • Deck & Roofing 200s Alamogordo High
  • Bus Loop improvements at Chapparal Middle
Number 20, painted on the paved ground of a parking lot with white paint.
Solid Line Parking Lots design vector icon design vector line icon svg
Solid Line Parking Lots design vector icon design vector line icon svg
Solid Line Parking Lots design vector icon design vector line icon svg
Solid Line Parking Lots design vector icon design vector line icon svg
Solid Line Parking Lots design vector icon design vector line icon svg

Paving & Striping

Funding:

SB9 & SB212




GO Bond

  • Student & Athletics parking lots along Tiger Drive behind Alamogordo High School will be repaved & restriped. Adjustments to speed bumps will also happen at that time, ensuring our students & visitors have a safe and good-quality parking area.
  • Bus loop improvements at Chaparral Middle School

Athletics

Current projects

Funding

SB9

SB9





SB9


GO Bond

GO Bond & Legislative

  • Painting - multiple facilities
  • Signage - wayfinding, informational & mural
  • Evaluation of locker rooms underway
  • Evaluation of softball fields underway
  • Evaluation of Lawerence E. Johnson Tiger Pit upgrades & scoreboard underway
  • Construction services for baseball complex storage shed
  • Pole Vault Pit Improvements
  • Stadium Lighting Replacement

Big Thank you to Senators Burt & Griggs & former Representative Black for securing the funds to make this project possible!

The new Alamogordo Tiger Varsity Soccer Field is a 93,100 sq ft synthetic turf play surface. The project consisted of the demolition and removal of existing natural turf and irrigation, grading and laser leveling of the field area, installation of sub-surface drainage, and installation of the new rubberized and impact-resistant synthetic turf. The field was funded through a special legislative appropriation for a total cost of $1,285,558.95.

The New Chaparral Middle School

The Future of Learning

Our schools are tasked with preparing our students for the opportunities and challenges of a rapidly changing world. Education can’t stand still as so much around us evolves. Around the country, leading schools are creating learning experiences that value the kinds of creativity, collaboration, critical thinking, and real-world problem-solving that ignite student passion and engagement. When students and teachers are eager to go to school each day, learning accelerates. The new Chaparral Middle School will support the kind of future-focused learning that is found at the best schools in America.


Team-based problem-solving and collaboration are key 21st century work skills that also help students learn and retain knowledge. In our new school, students and teachers will have the flexibility to work in this unique, flexible “Colab” space that is immediately adjacent to many of their normal classrooms.

More Information Coming Soon!

Play Button

Take a Tour!

The results of the geotechnical studies at the existing Chaparral site and the site proposed on Fairgrounds Road were found to be very similar. The building planning required to account for the soil composition at the Fairgrounds site is the same planning that is required at the existing Chaparral site, and no modifications to the land preparation were required with the relocation of the school to the original school site.

CMS Design Timeline:

  • November 19, 2020 - Hanglider Park Land Exchange approved by APS Supt. Perry and BOE
  • January 22, 2021 - Educational Specifications for CMS Completed and Approved by PSFA
  • February 12, 2021 - Procurement RFP Issued for Design Professional Services
  • April 21, 2021 - Design Professional Contract Approved by APS BOE
  • November 10, 2021 - 100% Schematic Design Completed by DP
  • January 24, 2022 - 50% Design Development Completed by DP
  • March 9, 2022 - Estimate of Probable Construction Cost was completed by DP at $66.5m
  • March 11, 2022 - 100% Design Development Completed by DP
  • March 12, 2022 - PSFA directed the Design Professional to develop cost savings strategies report for the project.
  • March 21, 2022 - PSFA rejected the Design Development submission due to the high Estimate of Probable Cost received. The Design Professional and each of their consultants were directed by PSFA to stop work pending a PSCOC decision to increase the award amount.
  • July 18, 2022 - PSCOC approved an increase to the initial MACC funding award from $27m to $37m
  • August 1, 2022 - PSFA directed the Design Professional to proceed with project redesign to lower construction costs from $66.6m to $37m to adequacy
  • August 22, 2022 - Per PSCOC and CID direction, PSFA directs the Design Professional to initiate a 100-year flood study of the Fairgrounds Rd. site.
  • December 7, 2022 - Design Professional completed the redesign of the building footprint and site plan and provided it to the Civil Engineer to enable them to complete the 100-year flood study.
  • March 3, 2023 - 100-year flood study completed and submitted to PSFA and APS with probable mitigation cost analysis, including an additional $2.4m to construct required fill, burms, rip-wrap, and channels on adjacent properties.
  • March 4, 2023 - APS directs the Design Professional to develop additional, lower-cost mitigation solutions for the 100-year flood issue
  • May 1, 2023 - 25% Construction Drawings complete. Civil Engineer redesign of stormwater mitigation cost lowered to $1.8m
  • May 2, 2023 - PSFA directs that no additional design work may be completed on construction documents until legal easements and right-of-ways have been secured for use of adjacent properties
  • May 10, 2023 - APS directs Design Professional to develop a memo containing the cost and time implications of relocating the project to the existing College Ave site.
  • June 21, 2023 - APS BOE votes to relocate new CMS back to existing College Ave. site.
Honey Hexagon Cells

Building Systems

Technology

Safety & Security

Areas of

Investment

Internal Learning Environments

Athletics

Outdoor Learning & Playgrounds

Will GB Bond, SB9 or HB33 funds be used for salaries? No. That is not legally allowed.

Email us with additional questions.

A Man and Woman Wearing Hard Hat While Talking

Alamogordo Public Schools

Connect with us!

Alamogordo Public Schools

1211 Hawaii Ave

Alamogordo, NM 88310

Tel. 575-812-6000

Email: communications @alamogordoschools.org

Website: www.alamogordoschools.org